| Project 1 |
|
|
| Design and build an 8,000 squarefoot stand alone laboratory/office building |
 |
| Building to be located on an undisturbed wooded site. All utilities to be brought to location. LDC responsible for all design, permitting and construction. |
 |
| Building to be 60% lab and 40% administrative and support facility. |
 |
| Project 2 |
|
| Design and build a 5.000 square foot stand alone laboratory building |
 |
| LD&C responsible for all design, permitting, construction, as well as, demolition of existing building. |
 |
| Project built within an existing petrochemical facility. |
 |
| Project 3 |
|
| Work with client to design new laboratory building on petrochemical refinery site. |
 |
Represented client before city planning commission to obtain all permits and appraisals. |
 |
| Provided all construction management contracts within a lump sum agreement. |
 |
| Provided al onsite supervision. |
 |
| Ensured on time delivery within budget. Total construction time: 5 months. |
 |
| Project 4 |
|
| New university lab building |
 |
| Furnished and installed all lab cabinets, tops, fume hoods and fixtures |
 |
| Project 5 |
|
| Worked with client to design safe, efficient, economical quality control lab. |
 |
| Furnished and installed all lab cabinets, tops, fume hoods and fixtures |
 |